One Supplier. One Roof.
Moulding to Sub-Assembly.
A one-stop manufacturing service — injection moulding, rotary spray painting, printing, hot stamping, ultrasonic welding, and sub-assembly — all under one ISO-certified roof in Johor Bahru. No outsourced finishing, no shipping between vendors, no second QC handoff to worry about.
The Problem With Multi-Vendor Finishing
Many small-to-mid molders subcontract painting, printing, and welding to separate finishing shops. Every handoff adds shipping time, a second QC checkpoint where defects can be introduced, and one more vendor relationship to manage and audit.
When color matching or a cosmetic finish is critical, a mismatch discovered after the part has already left the mould shop means a return trip, a delay, and a difficult conversation with your own customer.
- No shipping parts between separate moulding and finishing vendors
- No second QC handoff where damage or defects go unnoticed
- One point of contact and one production schedule to track
- Faster turnaround from mould to finished, decorated part
What's Actually In-House
Every secondary process runs inside our ISO 9001:2015 and ISO 14001:2015 certified facility, on the same site as moulding production:
- Auto Spray (Rotary) & Semi Auto Spray (Rotary) — gloss, matte, texture, Pantone/OEM colour-matched
- Tempo Printing & 2 Colour Tempo Printing — for irregular, concave, and convex surfaces
- Silk Screen Printing — multi-colour, ±0.1mm registration
- Hot Stamping (Vertical) — metallic, holographic, and matte foil decoration
- Ultrasonic welding — permanent joints, no adhesives or fasteners
- Laser engraving — coming soon
- Sub-assembly — multi-part builds delivered ready to install
One-Stop vs. Multi-Vendor Sourcing
| Factor | Nikkoplas (One-Stop) | Typical Multi-Vendor Setup |
|---|---|---|
| Moulding + finishing location | Same facility | Separate sites, separate shipping |
| Quality control checkpoints | Single ISO-controlled system | Split across vendors |
| Vendor relationships to manage | One | Two or more |
| Colour/finish accountability | Single point of responsibility | Disputes between vendors possible |
| Lead time from mould to finished part | Shorter — no inter-vendor transit | Longer — added shipping/handling steps |